Proposed Sewer Rate Adjustment

Print
Press Enter to show all options, press Tab go to next option

City Sewer Rate Adjustment 

On July 25, the City Council reviewed a draft of the 2017 Sewer Rate Study. The study analyzes the cost of providing sewer service and makes recommendations regarding the rate and structure in compliance with state law. The study found that a rate increase is recommended to ensure adequate funds are available to continue to maintain a safe and healthy sewer infrastructure. City Council approved staff’s recommendations, which included sending all property owners and customers a rate notice in compliance with Proposition 218, notices are being mailed on Friday, July 28, and setting a date to hold a public hearing on September 12, 2017. Below is additional information regarding the proposal.

Overview – Newport Beach Sewer Operations and Proposed Rate Adjustments

The City of Newport Beach (City) Municipal Operations Department (MOD) administers the sewer operations for the City.  In late 2016, MOD retained the consulting services of HF&H Consultants LLC to prepare a sewer rate study, make findings and recommendations regarding the City’s sewer rate structure and sewer rates. In July 2017, HF&H completed the Draft Sewer Rate Study and MOD brought it forward for City Council approval on July 25, 2017. The Final Sewer Rate Study may be viewed by clicking here, Sewer Rate Study.

General information about the City’s sewer operations

MOD operates and maintains approximately 197 miles of wastewater sewer mains, over 25,500 sewer laterals, and 21 sewer lift stations among other sewer system facilities. Operations, maintenance and repair activities include sewer line cleaning, root removal, manhole maintenance and repair, sewer lift station operation and maintenance, sewer line video inspection, and sewer lateral maintenance, repair and replacement. 

Adjusting sewer rates under Proposition 218 Law

In November 1996, California voters approved Proposition 218. As a result, California agencies such as the City of Newport Beach, must comply with it's requirements when setting or adjusting utility rates. Proposition 218 requires the City to provide written notice by mail to the owner of each parcel upon which the sewer rate will be imposed.

The Proposition 218 notice contains the following:

  1. The proposed amount of the sewer rate charges;
  2. The basis upon which the sewer rate charges were calculated;
  3. An explanation of the need for the new or increased sewer rate charges; and
  4. The date, time, and location of the public hearing at which the City Council will consider the increased sewer rate charges.

On July 25, 2017, the City Council authorized MOD to send out the Proposition 218 notice to Newport Beach property owners and sewer customers to inform them of the proposed sewer rates. Proposition 218 requires a 45-day comment period before the City Council may act on the proposed rates and finalize the tabulation of any protests received. The City Council set the public hearing for the proposed sewer rates for Tuesday, September 12, 2017. If adopted, the proposed sewer rates will go into effect on January 1, 2018. To view the Proposition 218 notice, click Proposition 218 Notice- Proposed Sewer Rates.

Sewer Enterprise Fund: What does the City's sewer bill pay for?

All revenue and expenditures related to the sewer services provided by the City are contained in the Sewer Enterprise Fund, which is separate from the General Fund. Funding for maintenance and replacement activities is collected from rate payers through the Municipal Services bill. The Newport Beach sewer bill covers the following three main categories of expenses:

  1. Operations includes the day-to-day operations and maintenance and is comprised of personnel salaries, contract maintenance, professional services, repair materials, permits, and internal service charges to the General Fund. In FY 2017-2018 the Sewer operations budget is $3,592,976.
  2. Replacement includes the annual replacement of aging infrastructure, capacity issues and recommended improvements per the City's 2010 Sewer Master Plan. The Master Plan estimated approximately $29 million in total projects to be completed over a 30-year period, or roughly $1 million per year.
  3. Reserves are established by City Council Policy F-2 where the minimum revenue level is set at a dollar amount equal to 50 percent of the annual operations budget. The intent of the Reserves Policy is to provide rate stabilization and funding in the event of a catastrophic failure of the infrastructure. In FY 2017-2018 the reserve target is $1,796,488.

Sewer Rate Study and why do the sewer rates need to be raised?

All sewer operations, maintenance, and capital improvement projects are funded through the Sewer Enterprise Fund. The last time the City raised its sewer rates was in 2006. Through operational efficiencies, the City has been able to operate and maintain the sewer system without an increase, However, current revenue estimates for the FY 2017-2018 Budget Sewer Fund is $2,571,186 and are insufficient to meet the operational expenditure requirements of $4,592,976. Currently, the Fund Reserve balance is being used to cover the shortfall. Without an increase to the sewer rate, the projected Sewer Enterprise Fund balance will drop below the City Council Reserve Policy in one year and will be completely depleted in two years.

Sewer Rate Structure: How are sewer bills currently calculated?

A customer’s sewer bill is a component of the Municipal Services statement sent to City sewer customers. The recommended structure of the rates remains fairly unchanged and includes a fixed and a variable rate. Currently, the sewer rates include a fixed fee, sewer use charge and two additional surcharges of $2 per month for each additional dwelling unit and $10 per month for customers with two-inch or larger water meters, respectively. The proposed rate structure eliminates these surcharges and adds the costs to the monthly fixed charge.

The proposed sewer rates for customers that receive WATER AND SEWER SERVICE from the City includes:

  • Fixed charge - a monthly sewer service charge based on the water meter size.
  • Sewer use charge - a monthly consumption charge based on each customer’s actual metered water use.
    •  (Consumption Unit - one HCF or 100 Cubic Feet equals 748 gallons)

     Updated Proposed Sewer Rates Table - Corrected

 

The proposed sewer rates for customers that receive SEWER SERVICE ONLY from the City include:

Sewer Use Charge - a monthly charge that combines a charge based on water meter size and a consumption charge based on average use for that meter size. (The table below is for Newport Beach residents or businesses that receive their water from either Irvine Ranch Water District or Mesa Water District but have their sewer service account with the City of Newport Beach.)

 Newport Beach Sewer Customers Only - Proposed Sewer Rates

 

 

 

 

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer