Construction is progressing nicely.  With the exception of the seat wall by the overlook trellis structure, all walls thoughout the park have been finished. The contractor is currently focusing on the intricate hardscape improvements by the butterfly garden, the roof of the restroom structure, and the meandering walkways throughout the park.  Landscape items such as large boulders and trees have been delivered and park amenities such as trash receptacles and benches have also arrived.

Construction is approximately 65 percent complete, is scheduled to be substantially completed by this December, and within budget.

- August 18, 2014

The proposed 13.67 acre Sunset Ridge Park is situated on the northwest corner of West Coast Highway and Superior Avenue in the West Newport community. The proposed park is to be an ‘active’ park per the city’s General Plan. Proposed park amenities include:

  • Pony League Baseball Field
  • Soccer Fields
  • Children's Play Area
  • Picnic Area
  • Restrooms 
  • Memorial Butterfly Garden
  • Overlook Area with Shade Structure
  • Meandering Concrete Walkways
  • Meandering Retaining Walls

Public parking is available at the adjacent existing parking lot off Superior Avenue.  Visitors can access the park from one of two proposed walkways or the stair case which is connected to the Superior Avenue and West Coast Highway sidewalk.  A serene butterfly garden is located at the east end of the park.  As you follow the meandering walkways to the west, visitors can enjoy a spectacular view of the Pacific Ocean from a shaded overlook area.  Moving further west, visitors will find two soccer fields and a Pony League baseball field.  The far west side of the park features a picnic area and a children’s play area for family enjoyment.  Restrooms are also located on the west side for convenience.

In addition to the program elements, the landscape design will compliment the overall character of West Newport while paying special attention to views of adjacent residents and the existing natural habitat. The passive area landscape on the perimeter of the site will be a more drought tolerant informal landscape, while the active play areas will be more manicured including turf grass. All landscape areas will be irrigated using an automatic underground system. The irrigation system will be divided into several systems based on the water requirements and sun orientation of landscape within each hyrodrozone. The irrigation system shall provide 100% head to head coverage and be designed to minimize overspray. 

Sunset Ridge Park Site Plan

Printable Site Plan [PDF]

Project Schedules

 

Construction Schedule

Two Week Look Ahead Schedule - July 28, 2014 to August 20, 2014 

Additional Project Information 

View our construction photo gallery

Sunset Ridge Park ground breaking ceremony - December 10, 2013 

Please click here to view more detailed information on this project. 

For additional information, please contact Senior Civil Engineer Andy Tran at 949-644-3315 or Construction Supervisor Marcus Puglisi at 949-644-3331.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 8/18/2014 11:46:56 AM