Fire Plan Check
Plan Check Process Overview The plan check process involves a detailed review of construction plans submitted by property owners, contractors, or developers. This review ensures compliance with the California Fire Code (CFC), California Building Code (CBC), National Fire Protection Association (NFPA) standards, and Newport Beach ordinances. Approved plans allow permitted installation work to begin, protecting life and property while maintaining public safety. Submittal Process Submitting your plans is the first step in the review process. Detailed construction plans with supporting documentation are required. During the review, our team evaluates compliance with applicable codes and provides feedback if adjustments are needed.
Step-by-Step Guide |
1. Prepare Your Plans
- Ensure compliance with all relevant codes and standards.
- Plans must be signed by a licensed design professional.
- Complete the fillable General Notes sheet and include it as page 1 of the plan set.
- Provide a minimum of two sets of plans and supporting documents.
2. Submit Your Plans
- Submit plans in person.
- Complete a Permit Application for fire review and permit at the time of submittal.
3. Fees
- Pay plan check, inspection permit, and associated fees at the time of submittal. (Latest Fee Schedule)
4. Plan Review
- A fire plans examiner will review your submission for compliance.
- You may be contacted via phone or email for additional information or clarification.
Plan Review Timelines:
- Initial Plan Check: Up to 15 business days.
- Revisions/Resubmittals: Up to 15 business days.
Special Submittals:
- Alternate Means and Methods Submittals
- Contact fire plans examiner for submittal details.
- Technical Assistance Submittals (Third Party / Fire Protection Engineer Reports)
- Contact fire plans examiner for submittal details.
5. Permit Inspection Requests
- Request inspections using the approved permit card.
- Contact the plan examiner for questions about plan check status, as you will not be notified automatically when plans are approved or returned for corrections.
Over-the-Counter Submittals
Over-the-counter submittals are available Monday through Thursday, 7:30 a.m. to 12:00 p.m., for smaller projects and quick reviews. These submittals do not involve calculation reviews.
Eligible Projects Include:
- Kitchen Suppression Systems
- Residential Fire Sprinklers (13D systems with fewer than 50 sprinklers)
- Small Commercial Fire Sprinklers (13 systems with fewer than 50 sprinklers)
- Fire Alarms (fewer than 20 devices total)
Associated Fees
Understanding the costs involved in the plan check process is essential for budgeting your project. View the Fee Schedule for detailed information about fire plan review and inspection fees.
Standards and Guidelines
All plan submissions must comply with the following standards and guidelines:
Contact Us
For additional assistance or inquiries about the plan check process, please contact us:
- Phone: (949) 644-3106
- Address: 100 Civic Center Drive, Newport Beach, CA 92660
FAQ’s